Discussion of the strategy for the treatment of acid mine waters by means of a passive system
Collection of samples and basic physical and chemical analysis
2
10-11.06.2019
Dekonta, Prague, Czech Republic
Consultations regarding the construction of a pilot installation for the treatment of leachate from a hazardous waste landfill
3
5-7.08.2019
Zakład Utylizacji Odpadów, Konin, Poland
Installation and commissioning of the pilot installation for the treatment of the sulfate and metal containing effluent
2018
No.
Date
Institution
Aim of the trip
1
19-23.02.2018
21-25.04.2018
25.08-01.09.2018
Gradir Montenegro, Sula, Montenegro
Collection of various samples of water (including AMD and flotation tailings) and rocks from the Pb-Zn mine and establishing the basics of cooperation aiming to develop a system for mine effluent remediation and recirculation of water in the process.
2
4.09.2018
Industrial Chemistry Research Institute, Warsaw, Poland
Meeting with the director and staff members of the Institute. Visit to the site where the pilot scale installation will be located.
2017
No.
Date
Institution
Aim of the trip
1
17.05.2017
BatEKO, Polkowice, Poland
Getting acquainted with the process of battery recycling technology
Effluents sample collection
2
19.07.2017
BatEKO, Polkowice, Poland
Effluents sample collection
Discussing obtained results
3
23.11.2017
ArcelorMittal, Warsaw, Poland
Collection of various samples from the smelter and establishing the basics of long-time cooperation involving the recycling of iron and zinc powders produced as by-products in the company.
W celu świadczenia usług na najwyższym poziomie stosujemy pliki cookies. Korzystanie z naszej witryny oznacza, że będą one zamieszczane w Państwa urządzeniu. W każdym momencie można dokonać zmiany ustawień Państwa przeglądarki.